304 Kick Plate Metal Steel Cleanroom Door for ISO Cleanroom Hospital Lab and Pharmaceutical Clean Room

Customization: Available
Style: Chinese
Open Style: Swing

Product Description

📋

Basic Specifications

Model NO.
LESHO-Clean
Sound Insulation
45 dB
Position
Interior
Max Size
W2400*H2800
Structure Material
Galvanized Steel / 304 Stainless Steel
Application
Hospital, Laboratory, Clean Room
Features
Security, Decoration, Rust-Proof
Capacity
5000 sets/Year
🚪

Product Description

Automatic & Manual Clean Room Steel Swing Door

Door Leaf1.0mm 304 stainless steel or galvanized steel with powder coating. Inside: High-density honeycomb.
Door Frame1.5mm galvanized steel or 1.0mm 304 stainless steel.
Vision WindowDouble-layer tempered clean room glass, flush with door surface.
Hinge & Lock304 Stainless steel durable hardware.
Seal StructureEPDM seal rubber all-round; automatic drop-down bottom seal.

Key Features

  • Sanitary Design: Pure flat, seamless, dust-free, and easy to clean.
  • High Durability: Surface spray electrostatic resin powder (minimum 70um thickness) for corrosion resistance.
  • Standard Compliance: Fully complies with Food-grade, Pharmaceutical GMP, and Electronic dust-free standards.
  • Advanced Sealing: Food-grade silicone rubber seals with automatic bottom strips to ensure airtightness.
🏆

Quality Assurance

Frequently Asked Questions

How do we get started with a project?
We only need your basic background information and project site details. Providing factory site plan drawings allows us to offer a complete set of solutions.
What about the installation process?
We provide clear installation manuals, videos, and precaution documents. For complex large projects, engineering guidance is available to ensure successful setup.
What is the typical lead time for production?
The standard lead time for production is approximately 7-10 days depending on the order volume.
What types of payment do you accept?
We usually accept T/T in advance, L/C for large sums, and Western Union. Other terms can be discussed upon request.
How is the after-sales service handled?
Spare parts are delivered within 24 hours via international couriers like DHL, UPS, or TNT to minimize downtime.
Can we apply to become a local agent?
Yes, we welcome new partners. We will review your local area to check for existing partnerships and discuss potential cooperation.

Related Products